Engineering Expertise for Space Commmunications
Callisto News

Study on the use of 25.5-27 Ghz band in ESA ground stations

Callisto is proud to announce the award of a new study for the European Space Agency.

The objective is to study the feasibility of modifications of the existing ESA DSA1 and DSA 2 antennas to support an additional downlink frequency around 26 GHz. The study must consider all aspects of the front-end system design including the antenna, beam waveguide, dichroics and feeds, LNAs, downconverters, demodulation and communications aspects.

The project will be undertaken in two main phases. The phase 1 covers the preliminary feasibility analysis and trade-off studies into alternative possible solutions. The phase 2 involves the detailed design of the antenna modifications, which are selected for further study.

Callisto will be supported in this activity by a team including:

• University of Pavia Department of Electronics, which will be responsible for the antenna optical design analysis, the dichroics design analysis and the feed preliminary analysis.
• ERA Technology Limited, which will be responsible for the feed detailed design analysis.
• Zelinda Limited, which will be responsible for the demodulator design analysis.
• Makalumedia GmbH, which will be responsible for data communication design analysis.


Subscribe to the News. Have the latest Callisto news delivered directly to you, through our News subscriptions in RSS format. What's RSS?